Along with $120,000 in donations from members, Billings TrailNet provided $346,000 for engineering, building Phase 1 in 2019, and matching funds for the City of Billings’ BUILD grant for the Skyline Trail.
The Inner Belt Loop, with a trail alongside it, will connect Highway 3 to Billings Heights. It’s now construction time!
Thanks to the Billings Gazette for covering the ceremony with photo and video here:
x

Donation

Would you like to donate?

$
 

Pin It on Pinterest

0
    0
    Your Cart
    Your cart is emptyReturn to Shop